Healthcare Construction Spending: 2026 Industry Data and Statistics

Back To Articles

October 20, 2026

•

Blog

•

Healing

BSA hired an independent research company to compile and analyze construction cost data, federal spending reports, and project procurement records across the U.S. healthcare facility landscape. This report draws on public datasets from the U.S. Census Bureau’s Value of Construction Put in Place Survey, FRED economic data published by the Federal Reserve Bank of St. Louis, ConstructConnect project tracking, RSMeans cost databases, and healthcare industry surveys from the American Society for Health Care Engineering (ASHE) and the American Hospital Association. The dataset spans new construction, expansions, renovations, and system upgrades across acute care hospitals, ambulatory facilities, specialty centers, and academic medical buildings. Spending figures are presented as seasonally adjusted annual rates (SAAR) unless otherwise noted. The tables below outline national spending benchmarks, facility-specific breakdowns, geographic distribution, cost-per-square-foot ranges, and key cost escalation variables that healthcare capital planners and design professionals should monitor in 2026.

U.S. Healthcare Construction Spending Has Grown Over 50% Since 2021

Total healthcare construction spending in the U.S. remains elevated in 2026, though it has moderated from its 2024–2025 peak as private health systems reevaluate capital budget priorities. At the same time, public sector investment is accelerating, a structural shift with meaningful implications for project pipelines. The table below aggregates annual average SAAR figures from the U.S. Census Bureau for 2021–2025 annual averages, with July 2026 shown as the latest annualized rate, the most recently published data point as of this report’s compilation.

The U.S. Healthcare Construction Spending Trend — 2021–2026

YearTotal SAAR (Annual Avg.)YoY ChangePrivate SectorPublic SectorPrivate Share
2021$49.3B—~$37.1B~$12.2B75.3%
2022$57.6B+16.8%~$43.5B~$14.1B75.5%
2023$68.2B+18.4%~$51.5B~$16.7B75.5%
2024$76.1B+11.6%~$57.5B~$18.6B75.6%
2025$77.2B+1.4%~$59.4B~$17.8B76.9%
2026 (Jul)$74.6B-2.4% (YoY)$56.3B$18.3B75.5%

Source: U.S. Census Bureau, Monthly Construction Spending Report, September 2026; Federal Reserve Bank of St. Louis (FRED), TLHLTHCONS Series, September 2026. Annual averages derived from monthly SAAR readings; 2026 reflects the July 2026 data point.

The 2022–2024 acceleration was the steepest on record. Healthcare construction SAAR grew more than 54% between 2021 and 2024 — the largest multi-year expansion in industry records going back to 2009. Post-pandemic facility backlogs, aging infrastructure, and health system consolidations requiring new flagship hospitals all drove the surge.

Public sector spending is rising even as private investment cools. While private healthcare construction spending fell 5.3% year-over-year by July 2026, public sector spending grew 7.9% over the same period, a clear reversal of the private-led growth trend that defined 2022–2025, reflecting increased investment in VA facilities, FQHCs, and public hospital replacements.

The 2026 moderation reflects market bifurcation, not collapse. ConstructConnect projects hospital and clinic construction starts will reach $30.7B in 2026, which marks an 11.6% increase over 2025, even as total SAAR edges lower. This may indicate a market with higher dollar volume but fewer projects; the distribution by project size and health-system type should be verified.

Ambulatory Facilities Are Reshaping the Healthcare Construction Mix

Hospitals continue to dominate healthcare construction by dollar volume, but the fastest-growing segment by project count is ambulatory care, which is a direct structural response to the shift toward outpatient delivery. The table below reflects estimated 2026 U.S. annual spending by facility type, derived from the Census Bureau’s total healthcare SAAR, ConstructConnect project tracking, and market composition analysis from industry reports.

The U.S. Healthcare Construction Spending by Facility Type — 2026

Facility TypeEst. U.S. Annual SpendMarket Share5-Yr CAGRPrimary Demand Driver
Hospitals & Health Systems~$38.8B~52.0%7.0%Aging population; inpatient volume +5.3% YoY; mega-project surge
Ambulatory Surgery Centers & Outpatient Clinics~$13.4B~18.0%9.2%Site-of-care shift; outpatient visits +9.8% YoY in 2025
Medical Office Buildings (MOBs)~$9.6B~12.9%5.0%Physician practice acquisitions; specialty expansion
Specialty Care Centers (Cancer, Cardiac, Ortho)~$6.7B~9.0%6.8%Chronic disease prevalence; oncology/cardiovascular volume growth
Academic Medical & Research Facilities~$4.1B~5.5%5.5%NIH-funded research investment; health sciences workforce pipelines
Long-Term Care & Rehabilitation~$1.9B~2.6%3.8%Aging demographic demand; post-acute care growth

Source: Market.us, Healthcare Construction Market Report, 2025; ConstructConnect/HFMA, March 2026; U.S. Census Bureau, September 2026; American Hospital Association, Fast Facts on U.S. Hospitals, February 2026.

At least 15 hospital projects valued at $1 billion or more were reported or advanced in 2025. $1B+ projects, which made up less than 10% of total hospital construction spent a decade ago, have grown to represent approximately 24% of total dollar volume. Fifteen projects exceeding $1 billion were announced in 2025 alone, including the $1.79B Ohio State Wexner Medical Center and a $3.4B inpatient tower at Children’s Hospital of Philadelphia.

Ambulatory care is the fastest-growing sub-segment by project count. In ASHE’s survey of 302 hospital executives, 13% reported active ambulatory facility construction, second only to hospitals. Outpatient revenues now represent 57% of total hospital revenue, up from 52% in 2020, with health systems racing to add surgery centers, microhospitals, and freestanding emergency departments (FSEDs) to capture the migration.

Academic and research facility demand is durable. Despite broader capital market pressures, university-affiliated health sciences and biomedical research buildings continue to attract institutional investment. BSA’s healthcare planning team has observed this directly across projects such as the IU Launch Accelerator for Biosciences and the Children’s Mercy Research Institute, reflecting a national pattern of sustained investment in discovery infrastructure tied to health system growth strategies.

Three States Accounted for More Than a Quarter of All New Hospital Builds in 2025

New hospital and clinic construction is heavily concentrated in high-growth states, which is a pattern driven by population migration, regulatory compliance mandates, and regional health system consolidation. The table below presents ConstructConnect new-start tracking data for hospital and clinic construction in 2025, the most recently completed full-year dataset.

The Hospital & Clinic New Construction Starts by State — 2025

StateNew Starts (2025)Share of National TotalKey Growth DriverNotable Activity
Texas2711.4%Population growth; employer expansion; uninsured market pressureLeads all states across all construction categories
Florida187.6%Aging retiree population; COVID-era net in-migration2nd-highest new-build volume nationally
California177.2%Seismic compliance deadlines (SB 1953)Replacement builds required regardless of capacity need
Tennessee135.5%Regional health system consolidationEmerging Southeastern hub for specialty care systems
North Carolina~11~4.7%Academic medical center expansion (WakeMed, UNC, Atrium)Ranked busiest state by Skanska construction activity data
Oregon~8~3.4%Statewide inpatient bed-capacity deficitActive replacement and expansion hospital pipeline
All Other States~142~60.2%Varied local demand factorsProjects concentrated in suburban metro corridors

Total new starts 2025: 236 hospital and clinic new builds nationally. Source: ConstructConnect, reported by HFMA, March 17, 2026; Skanska USA Building, 2026.

Texas, Florida, and California together represented more than one in four new hospital builds nationally in 2025. In healthcare, this concentration is amplified by population-driven demand (Texas, Florida) and regulatory compliance requirements (California), creating a persistent, multi-year demand floor that is less sensitive to interest rate fluctuations than other construction sectors.

California’s seismic mandate is an independent structural demand driver. Under SB 1953, California hospitals face non-waivable structural compliance deadlines, forcing replacement construction even where additional capacity is not the primary need. This regulatory pressure sustains a floor of new hospital activity regardless of local market financial conditions.

North Carolina is establishing itself as a national healthcare construction leader. Ranked the busiest state for overall healthcare construction activity by Skanska USA Building, North Carolina reflects a convergence of academic medical expansion, Research Triangle population growth, and major health system investment. BSA’s project work in the Carolinas, including the WakeMed Cary Hospital Patient Tower vertical expansion and a stand-alone emergency department in Wendell, illustrates this market’s sustained pipeline depth.

National Average Hospital Construction Costs Range From $300 to Over $800 Per Square Foot in 2026

Healthcare facility construction remains among the most capital-intensive building categories in the U.S., with per-square-foot costs that vary dramatically based on facility type, clinical program complexity, and geographic market. The benchmarks below are derived from RSMeans cost databases and the ENR Construction Cost Index.

The Healthcare Construction Cost Per Square Foot by Building Type — 2026

Facility TypeCost/Sq Ft (Low)Cost/Sq Ft (High)National AvgAvg. Project SizeTypical Timeline
Large Tertiary Hospital (500+ beds)$560$800+~$680/sq ft450,000–750,000 sq ft36–48 months
Specialized Medical Facility (Cancer/Cardiac)$500$700~$600/sq ft75,000–150,000 sq ft24–30 months
General Acute Care Hospital (2–3 story)$430$470~$450/sq ft200,000–446,000 sq ft24–36 months
Outpatient Surgery Center$450$650~$550/sq ft25,000–75,000 sq ft18–24 months
Ambulatory Care Center$350$500~$425/sq ft40,000–100,000 sq ft15–22 months
Micro-Hospital / Freestanding ED$300$425~$362/sq ft10,000–30,000 sq ft12–18 months

Source: RSMeans/Gordian, Hospital Construction Costs, December 2024; ENR Construction Cost Index, 2026; iRecruit Healthcare Construction Benchmarks, 2026.

MEP systems represent the single largest cost component across all facility types. Mechanical, electrical, and plumbing systems account for 28–32% of total hospital construction cost – the highest ratio of any building category – with HVAC and medical gas systems adding another 16–19%. For outpatient surgery centers, MEP cost percentages are even higher given the intensive air filtration standards and medical gas requirements that rival full inpatient surgical suites.

Outpatient surgery centers cost as much per square foot as many inpatient hospitals. Despite their smaller scale, ASCs command $450–$650/sq ft – comparable to general acute care hospital construction – because their clinical program density requires full surgical infrastructure compressed into a compact envelope. This cost dynamic is driving some health systems toward co-located ambulatory campuses that share MEP infrastructure across facility types.

Projects delivered on compressed timelines carry an 8–15% cost premium. Based on BSA’s healthcare construction experience, accelerated schedules consistently add cost through expedited permitting fees, premium overtime labor rates, and accelerated material procurement. Integrated firms that unify architecture, engineering, and planning from project inception, rather than sequentially, can substantially reduce this timeline risk and the associated budget exposure.

Healthcare Construction Cost Escalation Has Stabilized — But Remains Above Pre-Pandemic Levels

After the extreme volatility of 2021–2023, when healthcare construction costs surged in parallel with post-pandemic supply chain disruptions and acute labor shortages, the escalation environment has meaningfully stabilized in 2026. However, input costs remain structurally elevated above 2019 baselines, and MEP labor and materials continue to track well above general CPI. The table below compares 2025 benchmarks to 2026 actuals and 2027 projections across the primary cost variables affecting healthcare construction project budgets.

The Healthcare Construction Cost Escalation Factors — 2025 vs. 2026 vs. 2027 Forecast

Cost Factor2025 Baseline2026 Current2027 ProjectedImpact Level
MEP Labor Rates (Fully Loaded)$36–$38/hr$38–$41/hr$41–$44/hrHigh
MEP Materials & EquipmentBaseline+2.8% to +4.2%+3.0% to +4.5%High
Steel & Structural MaterialsBaseline+0.5% to +1.2%+1.3% to +2.0%Low
Concrete & MasonryBaseline-0.8% to +0.5%+1.5% to +2.8%Medium
Supply Chain Lead Times12–16 weeks10–14 weeks9–13 weeksMedium
Construction Financing Rate5.25–5.75%3.50–3.75%4.00–4.50%Medium
Regulatory / Compliance CostsBaseline+1.5% to +2.0%+2.0% to +3.0%Medium
Overall Annual Cost Escalation+3.2%+2.0% to +4.0%+2.5% to +4.5%Medium

Source: RSMeans/Gordian, December 2024; Bureau of Labor Statistics, 2026; ENR Cost Report, 2026; Deloitte, 2026 Engineering and Construction Industry Outlook.

MEP labor is the most persistent cost pressure in healthcare construction in 2026. Skilled MEP trades averaged $38–$41 per hour nationally, with high-demand urban markets trending materially higher. Construction labor associations project a shortage of several hundred thousand skilled trades workers nationwide over the next two years – wage pressure unlikely to moderate before 2028 regardless of broader macroeconomic conditions.

The interest rate drop from 2025 to 2026 is unlocking deferred capital projects. With construction financing rates declining from a 5.25–5.75% peak to approximately 3.50–3.75%, healthcare projects deferred during the high-rate period are re-entering feasibility analysis. This rate environment is expected to fuel a 2026–2028 uptick in project announcements, particularly among mid-tier health systems that remained sidelined during peak rate conditions.

Supply chain recovery is real but uneven. Lead times for standard MEP equipment have compressed from 12–16 weeks to 10–14 weeks, which is a meaningful scheduling gain. However, specialized medical equipment such as large-bore imaging systems, surgical robotic infrastructure, and custom cleanroom HVAC continue to carry 18–24+ month procurement windows. Systems that begin equipment procurement late in the design phase routinely absorb schedule overruns that compound cost escalation.

Requesting a Copy of This Report

BSA’s research team compiled and reviewed this healthcare construction spending dataset as part of our commitment to evidence-based practice in healthcare facility planning and design. BSA is a trusted, integrated design partner, offering architecture, engineering, planning, and interior design services under one roof, with a national portfolio spanning acute care hospitals, ambulatory facilities, academic medical centers, and research institutions. If you’d like to request a PDF copy of this report or learn more about our agency, you can reach out here.

Sources

  • Monthly Construction Spending, July 2026. U.S. Census Bureau; Washington, D.C.; September 1, 2026. https://www.census.gov/construction/c30/current/index.html
  • Total Construction Spending: Health Care in the United States (TLHLTHCONS). Federal Reserve Bank of St. Louis (FRED); St. Louis, MO; September 2026. https://fred.stlouisfed.org/series/tlhlthcons
  • Rich Daly. Despite Pressures, Healthcare Construction Spending to Increase. Healthcare Financial Management Association (HFMA); Downers Grove, IL; March 17, 2026. https://www.hfma.org/fast-finance/hospital-construction-spending-forecast-2030/
  • Market.us. Healthcare Construction Market: Industry Forecast 2025–2034. New York, NY; 2025. https://market.us/report/healthcare-construction-market/
  • RSMeans/Gordian. Hospital Construction Costs. Greenville, SC; December 2024. https://www.rsmeans.com
  • American Hospital Association. Fast Facts on U.S. Hospitals, 2026. Chicago, IL; February 2026. https://www.aha.org/statistics/fast-facts-us-hospitals